TOP63753 Noteworks Project Planner w/Paperboard Cover, 8-1/2 x 11-3/4 By TOPS BUSINESS FORMS
Item # TOP63753
Brand: TOPSŪ
Reg. $17.41
Sale $9.19
(You Save 47%)
In Stock - Usually ships the next business day
- Description
- Specs
- Related Items
- Reviews
Description
Special notetaking ruling features sections for prioritizing actions, comments and notes. Numbered line format, front and back. Heavyweight 60-pt. chipboard back. Letr-TrimŪ perforation for clean tear-out. Coil-lock wire binding. Sturdy, rigid paperboard cover. 20 lb. Pad Type: Notebook; Sheet Size: 8 1/2 x 11 3/4; Ruling: Ruled.
Specifications
- Special notetaking ruling features sections for prioritizing actions, comments and notes.
- Numbered line format, front and back.
- Heavyweight 60-pt. chipboard back.
- Letr-TrimŪ perforation for clean tear-out.
- Coil-lock wire binding.
- Dimension With Packaging: 12.1(D) x 8.6(W) x 0.3(H)
- Includes one notebook.
Green Product










